There are four Golden Lane Estate related facebook accounts and you can follow them here: goldenlaneEC1
21 discussions
170 discussions
608 discussions
126 discussions
1411 discussions
127 discussions
16 discussions
21 discussions
235 discussions
Dear Neighbour Please see below activities relating to the COLPAI Project, which are due to take place from Monday 20 January. Monday 20 January - Friday 24 January Works will include: Breaking concrete and reduce level dig to the residential area Groundworks to the residential area Groundworks to school areas Excavators filling muck away lorries Asbestos watching brief Air quality monitoring Environmental monitoring. Saturday 25 January– Sunday 26 January No works. Notable Points Asbestos removal works are being carried out in-line with guidance from the Health and Safety Executive An environmental air analyst will be present to monitor the site during works. On-site security Security Guard now on-site full time 7.00am – 6.30pm CCTV Security cameras are now monitoring the site 24 hours a day, 7 days a week. Deliveries Muck-away and stone lorries Pit lane on Golden Lane is now operational for lifting materials by crane into the site. Non-ISG Works Road sweeper in place to clean Golden Lane following the muck-away lorries leaving the site. Working Hours Monday to Friday 08:00 to 18:00 Saturday 9:00 to 14:00 Consented Reduced Impact Hours During reduced impact hours, works will still take place on-site. However, works will not involve percussive machinery or other similar construction involving heavy machinery. Monday to Friday 10:00 to 12:00 and 14:00 to 16:00 Noise, dust and vibration monitoring is in place. For site emergencies, please contact: Steven McCarthy, ISG T: 07825 719 496 Stephen Beattie, ISG T: 07816 418 156
Tags:
© 2024 Created by GLE Website Comms Team. Powered by