welcome

The Golden Lane Estate website is run by GLE residents (GLE website comms team) and supported by the Golden Lane Residents' Association.

The forums are moderated.  Any comments which appear to be abusive or potentially libellous or which contravene the terms of service under which the site is licensed by the service provider Ning will be removed. 

Privacy Policy

Forum

MAJOR WORKS & PROJECTS

54 discussions

COLPAI

Site of former Richard Cloudesley School

92 discussions

BERNARD MORGAN HOUSE

16 discussions

GENERAL COMMENTS & QUERIES

1175 discussions

COMMUNITY CENTRE

15 discussions

HEALTH & WELLBEING

27 discussions

ESTATE OFFICE ANNOUNCEMENTS

466 discussions

ITEMS FOR SALE OR RECYCLE

180 discussions

COLPAI Project Weekly Work Update – W/C Monday 22 April 2019

Dear Neighbour

Please see below activities relating to the COLPAI Project, which are due to take place from Tuesday 23 April 2019.

Monday 22 April

  • Site is closed for Easter Break.

Tuesday 23 April - Friday 26 April

Works will include:

  • Demolition of boundary wall along Baltic Street and Hatfield House
  • UKPS connection works along Basterfield Service Road
  • Removal of hoarding on Basterfield Service Road to accommodate UKPS works
  • Excavation of trial inspection pits
  • Breaking of ground floor slabs with an excavator
  • Asbestos monitoring and removal
  • Demolition material being removed from site
  • Air quality monitoring
  • Environmental monitoring.

Saturday 27 April – Sunday 28 April

  • No works.

Notable Points

  • The breaking of ground floor slabs will not be carried out during the reduced impact hours
  • Asbestos removal works are being carried out in-line with guidance from the Health and Safety Executive
  • CCTV on site - For additional security ISG has installed a CCTV monitoring system. The site is monitored 24 hours a day, seven days a week. This system is only active within the site boundary and cannot be directed outside the boundary lines
  • An environmental air analyst will be present to monitor the site during works.

Deliveries

  • Muck-away lorries.

Non-ISG Works

  • Road sweeper in place to clean Golden Lane following the muck-away lorries leaving the site.

 Events

  • Drop-in Event on Thursday 25 April from 6pm-8pm at the Golden Lane Estate Community Centre, Fann Street, London, EC1Y 0RN. The project team will be sharing the outcome of the consultation on the replacement of trees on-site and will be on hand to answer any questions relating to works on-site. 

Working Hours

Monday to Friday 08:00 to 18:00

Saturday 9:00 to 14:00

Consented Reduced Impact Hours

During reduced impact hours, works will still take place on-site, however, works will not involve percussive machinery or other similar construction involving heavy machinery.

Monday to Friday 10:00 to 12:00 and 14:00 to 16:00

Noise, dust and vibration monitoring is in place. 

For site emergencies, please contact:

Steven McCarthy, ISG

T: 07825 719 496

Stephen Beattie, ISG

T: 07816 418 156

Views: 22

Reply to This

© 2019   Created by Paul Lincoln.   Powered by

Badges  |  Report an Issue  |  Terms of Service