Dear Neighbour Please see below activities relating to the COLPAI Project, which are due to take place from Monday 24 June 2019. Monday 24 June- Friday 28 June Works will include:
- Installing site cabin foundations and drainage
- Reducing ground for pile mat works
- Removing obstructions in ground
- Excavators filling muck away lorries
- Asbestos watching brief
- Air quality monitoring
- Environmental monitoring.
Saturday 29 June – Sunday 30 June
Notable Points
- Asbestos removal works are being carried out in-line with guidance from the Health and Safety Executive
- An environmental air analyst will be present to monitor the site during works.
CCTV on site
- For additional security, ISG has installed a CCTV monitoring system. The site is monitored 24 hours a day, seven days a week. This system is only active within the site boundary and cannot be directed outside the boundary lines.
Deliveries
Non-ISG Works
- Road sweeper in place to clean Golden Lane following the muck-away lorries leaving the site.
Working Hours Monday to Friday 08:00 to 18:00 Saturday 9:00 to 14:00 Consented Reduced Impact Hours During reduced impact hours, works will still take place on-site. However, works will not involve percussive machinery or other similar construction involving heavy machinery. Monday to Friday 10:00 to 12:00 and 14:00 to 16:00 Noise, dust and vibration monitoring is in place.
For site emergencies, please contact: Steven McCarthy, ISG T: 07825 719 496 Stephen Beattie, ISG T: 07816 418 156
|