Latest Activity

Sheila replied to Sam's discussion Looking for studio / 1 bed to rent
Monday
Sam posted a discussion
Saturday
An event by Paul Lincoln was featured

Imagine Golden Lane and Community Cafe next Saturday at Under Crescent House

April 27, 2024 from 2pm to 4pm
Saturday
Paul Lincoln posted an event

Imagine Golden Lane and Community Cafe next Saturday at Under Crescent House

April 27, 2024 from 2pm to 4pm
Saturday

Facebook

There are four Golden Lane Estate related facebook accounts and you can follow them here: goldenlaneEC1 

Golden Lane Estate / RCS site 

Save Bernard Morgan House

City of London


The Leisure Centre is now closed.  Planning permission was granted just before Christmas for revised proposals for the Centre. They still need to be approved by the Secretary of State as Listed Buildings Consent is also required.

 

The main changes are:

  • Windows to the gym - the area currently used for offices - will not be single sheets of glass but have a window design.
  • The dance studio which was proposed to fill the gap at ground floor level between the sports hall and swimming pool is now to be moved to the basement level space.
  • The photovoltaic panels which were to have been at an angle to the roof will now be level with the roof.

There is no news on when building works will start.

 

Paul Lincoln

2 January 2011

Views: 34

Reply to This

© 2024   Created by Paul Lincoln.   Powered by

Badges  |  Report an Issue  |  Terms of Service